Procurement Management System For Engineering Materials And Equipment

2010/12/8 17:05:00 45

Procurement Management Of Engineering Materials And Equipment

  

Engineering materials

equipment

purchasing management

system


In order to strengthen the management of procurement of engineering materials and equipment, according to the relevant state regulations

Laws and regulations

In accordance with the actual conditions of the company, the system is formulated.


First, the project technology department is the first responsibility department of the procurement management of engineering materials and equipment, and the specific work is completed by the project technology department and the investment development department.


Two, for the procurement of bulk materials and large equipment, public bidding or inviting tenders must be carried out.

Through investigation and comprehensive selection, materials and equipment with relatively low price and quality guarantee are adopted.


Three, for a small number of materials and equipment that are not suitable for tender projects, we need to have a detailed inspection and choose the right products.


Four. The materials and equipment needed for the project should be made according to the quantity, specifications and time of use, etc., so as to ensure the time limit for the project.


After determining the procurement of suppliers of engineering materials and equipment, detailed supply contracts should be signed, including origin, brand, grade, quantity, price, type, and delivery time. According to the stipulations of the contract, ensure timely supply.


Five. Engineering materials and equipment shall be specially managed, and materials and equipment will be checked and checked in time after entering the field.

For non qualified materials and equipment, it is strictly prohibited to go through the formalities of warehousing, materials and equipment, and go through the procedures for warehousing and warehousing. After processing, the materials and equipment shall be sent to the finance department in a timely manner to ensure that the accounts are consistent and the accounts are in line with each other.


Six, the supplier should provide timely proof of engineering materials and equipment and related notes for settlement.


Seven. The project technical department and its site representative strictly carry out the materials and equipment for the entering works.


Supervise and check the acceptance to ensure the quality of the project.

  • Related reading

Project Contracting System

Rules and regulations
|
2010/12/8 17:05:00
41

公司勞動安全保障制度

Rules and regulations
|
2010/12/8 17:03:00
64

公司員工職業(yè)發(fā)展制度

Rules and regulations
|
2010/12/7 15:54:00
60

公司考評結(jié)果人事工作的依據(jù)

Rules and regulations
|
2010/12/7 15:52:00
46

公司的績效考評制度

Rules and regulations
|
2010/12/7 15:50:00
90
Read the next article

石獅紡機(jī)企業(yè)奮力轉(zhuǎn)型博先機(jī)

  石獅臺帆紡織機(jī)械有限公司大圓機(jī)生產(chǎn)車間一片繁忙,一臺臺新型高精密紡織大圓機(jī)從車間發(fā)出,運(yùn)往晉江、長樂、紹興等國內(nèi)紡織服裝生產(chǎn)重地。